Henan Baishun Machinery Equipment Co., Ltd.
products
News
Home > News >
Company News About How to assemble a heavy duty cnc lathe machine?
Events
Contacts
Contacts: Mr. Andrew
Fax: 86-371-55553753
Contact Now
Mail Us

How to assemble a heavy duty cnc lathe machine?

2024-03-12
Latest company news about How to assemble a heavy duty cnc lathe machine?

How to assemble a heavy duty cnc lathe machine


  After unpacking, lift the base worktable, put the adjusting sizing block after threading the anchor bolt, place a leveling ruler on the surface of the worktable after falling, level the base front, back, left and right with a level gauge, grout the anchor bolt after adjusting to the complete level, align the horizontal worktable twice after the cement is completely solidified, and then lock the lock nut of the anchor bolt. 


After leveling and fixing the base workbench, take out the three oil pipes on the right side of the base. When installing the right column, lift the column and thread it into the anchor bolt, and then thread the three oil pipes in the base from the inside of the column and out from the outside. Then, stick the column close to the base, and place the cushion block at the top screw position of the column anchor. There are two horizontal and vertical locating pins on the connecting surface between the column and the base. After roughly leveling by the locating pin hole, insert two connecting bolts in the front and rear positions of the column and tighten them until no gap can be seen. Then align the column with a level gauge. When aligning, the left and right columns need to be in the same plane. After the column is vertically aligned, insert the remaining bolts and tighten them, and align the column with a level gauge again, Finally, drive in the locating pin. 

 

After the left and right columns are connected with the base, install the connecting beam. When installing the connecting beam, first lock the end without adjusting pad, and then place the adjusting pad between the connecting beam and the column and lock the bolts.

Install the cross beam after the installation of the connecting beam. First place two equal height blocks on the upper surface of the workbench, hang the cross beam on the guide rail surface of the column, then place it on the equal height block, and install the left and right pressing plates and inserts of the cross beam. Make sure that the two equal height blocks are placed stably.

 

After the beam support is stable, screw in two beam lifting lead screws from top to bottom, and screw the lead screw to the lowest position to prevent the lead screw from bending when installing the cap.

After the lead screw is screwed in, place the cap on the upper end of the column. The cap and the column are connected by pin positioning and bolt fastening. Adjust the height position of the lead screw until the thread at the shaft end exposes the upper end face of the worm gear.

After the beam is leveled, install the left and right vertical tool holders, which are fastened and connected by the T-bolt between the ram seat and the sliding plate, and the angle is adjusted vertically by the worm on the upper part of the ram seat. The main motor and feed box motor have been disassembled before delivery, and the motor can be installed in any step of the installation process. So far, the mechanical part has been installed.